The Box Canyon Hydroelectric Project was constructed during the early 1950's to provide power to the residents of Pend Oreille County and Seattle, Washington.
The Coyote Springs No. 2 project is a combined cycle natural gas fired power plant owned by Avista Corp. The project is located in Boardman, Oregon and station service is provided by Umatilla Electric Cooperative.
Inland Empire Paper Company Millwood, Washington New 600 Ton per day Paper Machine Installation of a new paper machine at the Inland Empire Paper Company facility required the installation of substation and transmission facilities to serve the new electrical loads totaling 30 MVA.
Northern Lights serves the rural areas of north Idaho including the Priest Lake and Clark Fork River service areas.
Cooper NOVA reclosers were installed into an existing outdoor metal enclosure. Form 6 controls were installed in the control building. The 25 kV system voltage required special attention to clearances in the enclosure.
The history of San Vicente dates back over two hundred years when the Spanish used horse drawn carts at this underground mine. The project is located in the south east part of Bolivia in the Andes mountains. The elevation of the project is 15,000 feet above mean sea level.